Gather Info/Exist Conditions
|
Test Phase
|
Update Phase
|
|
General
|
- Coordinate with admin.
- Review DRA Report
- Review meeting notes
|
- Meet with Committee twice
- Present overall summary of work done to date
- Coordinate with admin.
|
- Meet with committee once
- Final presentation to School Board
- Coordinate with admin
|
Program
Building and Site
|
|
- Compare DRA program with state and others
- Concept Focus Group with key staff
|
- Develop revised program of space needs: building and site
|
|
Building
|
- Receive dwgs and respond
- Verify existing conditions
|
- Evaluate DRA design concept
|
- Develop planning diagrams showing minimum/maximum costs
- Revise cost estimate
- Final drawings
|
|
Site
|
- Receive dwgs and report
- Verify existing conditions
|
- Evaluate DRA design concepts
- Evaluate DRA cost estimate
|
- Develop planning diagrams showing minimum/maximum costs
- Revise cost estimates
- Final drawings
|